Wilhelmspalais Stuttgart – Conversion to a City Museum

The state capital Stuttgart is converting the listed Wilhelmspalais into a city museum. The concept of the architects Lederer, Ragnarsdóttir, Oei and the exhibition designer Jangled Nerves, Stuttgart, deals with the basic principles of the original building of the Italian master builder Salucci, which was destroyed down to the outer walls in World War II. Without falling into reconstruction, the architects develop a consciously modern museum on the basis of the original spatial structure.

Construction of a subway restaurant

Kelley Barracks, Stuttgart

Renovation of Chateau Favorite

Favorite Baroque Chateau in Ludwigsburg

Construction of a Railway Station in Stuttgart

 

Between Jägerstraße in the north and Sängerstraße Höhe Nordportal Wagenburgtunnel Süden runs the 900 meter long and up to 80 meter wide railway station. A modern station hall with four 420 m long and ten m wide platforms is being built transversely below the previous buffer stops.

laying of the first stone

Die Deutsche Bahn AG hat die Grundsteinlegung für den zukünftigen Stuttgarter Hauptbahnhof gefeiert. Mit einem symbolischen Akt wurde auf dem ersten betonierten Abschnitt der Bodenplatte des Bahnhofs der Grundstein für das zentrale Bauwerk des Bahnprojekts Stuttgart–Ulm gelegt.

New construction of the main stand


The new main stand in Gazi-Stadion at the Waldau in Stuttgart-Degerloch. A home ground of Stuttgarter Kickers, VfB Stuttgart II and the ASC Stuttgart Scorpions (American Football).

Seminar for Didactic


Reconstruction and renovation of the State Department of Didactics and Teacher Education. The renovated buildings in the Königsallee in Ludwigsburg are part of an artistic ambicious building complex of financial administration.